Grange Hall Project, Phase II – Basement

Phase II – Basement

New Steel Beam Support

New Steel Beam Support

This Phase included improvements to the building itself and in this section the foundation was improved to better support the building. See the slide show showing the basement improvements of Phase II made in 2006 and 2007. See first Grange Hall post for more information.

  • complete architectural and engineering plans
  • all state permits required so far have been obtained
  • leveled the sagging floor
  • leveled the basement floor and add gravel
  • installed insulated sub-basement heating ducts
  • installed engineered iron support beam system under floor
  • replaced rotted southeast corner post and other damaged pieces
  • built shell of addition to house lift and baths
  • added cement block to the foundation and raise grade
  • attach well and septic service into building
  • original balcony and coffered ceiling revealed
  • restoration of the exterior shell
  • replace windows to original tall design
  • exterior painting and grading