Grange Hall Project, Phase III Framing

Phase III Framing

Kitchen and mechanical room wallsThis Phase included the installation of the accessibility lift, pouring the cement floor in the lower level and re-slating of the roof. The final steps were framing the interior of the new lower level space and addition.  See first Grange Hall post for more information.